Skip to content
EN ⌄
Discuss your project ↗

Distillation tray parts

Replacement tray panels, valves, downcomers, supports and fasteners must match the original hydraulic and mechanical design. Send the equipment tag, drawing revision, dimensions, material and wear photographs. We check fit, open area, liquid levels and installation access before release.

CNE v4-trays

CNE project photography

01 / CNE

Match internals to the process duty

An ethanol column must be considered with its feed composition, vapour and liquid loads, pressure regime and expected operating range. The photographs show several tray and valve configurations. Selection is made for the specific duty; one tray arrangement is not a universal specification for every feedstock or product grade.

02 / CNE

Make inspection possible

Support details, tray installation, liquid passages and access for inspection are coordinated with the column shell. Shop and site checks follow the approved drawings and inspection plan. The equipment handover should retain the material records, assembly checks and any approved deviations for future maintenance.

CNE / Discuss your project

Your next plant starts with the right conversation.

Share your feedstock, target product and capacity. Let’s shape a practical process concept.

Discuss your project ↗
滚动至顶部