Tray geometry, liquid distribution and mechanical assembly are part of the separation system. CNE’s equipment archive provides a close view of the components inside the columns.
An ethanol column must be considered with its feed composition, vapour and liquid loads, pressure regime and expected operating range. The photographs show several tray and valve configurations. Selection is made for the specific duty; one tray arrangement is not a universal specification for every feedstock or product grade.
02 /
Make inspection possible
Support details, tray installation, liquid passages and access for inspection are coordinated with the column shell. Shop and site checks follow the approved drawings and inspection plan. The equipment handover should retain the material records, assembly checks and any approved deviations for future maintenance.
03 /
Quality and performance verification
The project agreement defines product quality, operating conditions and measurement boundaries. Sampling methods, calibrated instruments and an agreed test programme provide a clear basis for performance verification and handover.
Our Boluo manufacturing base connects equipment design with fabrication and inspection. Automated cutting, welding equipment, tube-sheet production and vessel assembly support columns, heat exchangers and pressure equipment. Materials, welds, dimensional checks and inspection records follow the approved project requirements.
CNE’s reference register contains repeated upgrades to distillation, dehydration, liquefaction and evaporation systems. Start with the bottleneck and define a measurable improvement.