Accessories & spare parts
Maintenance parts and replacement components selected for the actual equipment: tray and packing elements, distributors, seals, gaskets and instrumentation interfaces. Availability and compatibility are confirmed against the equipment records.
CNE project photography
01 / CNE
Match internals to the process duty
An ethanol column must be considered with its feed composition, vapour and liquid loads, pressure regime and expected operating range. The photographs show several tray and valve configurations. Selection is made for the specific duty; one tray arrangement is not a universal specification for every feedstock or product grade.
02 / CNE
Make inspection possible
Support details, tray installation, liquid passages and access for inspection are coordinated with the column shell. Shop and site checks follow the approved drawings and inspection plan. The equipment handover should retain the material records, assembly checks and any approved deviations for future maintenance.
Explore the engineering behind the project
CNE / Discuss your project
Your next plant starts with the right conversation.
Share your feedstock, target product and capacity. Let’s shape a practical process concept.
