Quality assurance & traceability
Control the documents, verify the materials, inspect the work and retain the records. These are the foundations of CNE’s documented project quality approach.
CNE project photography
01 / CNE
Controlled drawings and procurement
Construction drawings and change notices are registered and distributed under document control. Superseded documents are withdrawn from use. Suppliers are assessed against project quality requirements, and purchased products are verified against their specifications. These controls keep procurement, manufacture and installation aligned to the approved design.
02 / CNE
Material identity and inspection records
Material batches and fabricated items are identified to avoid mix-ups and support traceability. Product certificates and quality documents accompany the corresponding equipment or material. Construction checks include team inspections, discipline checks and quality review, with records for concealed work and equipment trial runs.
03 / CNE
Acceptance and qualification documents
The owner’s inspection findings are recorded and closed through the project quality process. Final handover brings together the agreed inspection and test records. For procurement qualification, request the current certificates and their applicable scope; the required vessel code, inspection authority and destination-country requirements are established for each contract.
Explore the engineering behind the project
CNE / Discuss your project
Your next plant starts with the right conversation.
Share your feedstock, target product and capacity. Let’s shape a practical process concept.