COFCO · Anhui
300,000 t/y · China
Our project covers a 300,000-tonne-per-year fuel ethanol project for COFCO in Anhui. Its recorded scope covers the main alcohol distillation unit: engineering, equipment and material supply, construction, commissioning and operational handover.
CNE project photography
CNE / Related reference entries
| Reference | Customer / contracting entity | Project scope · English source title |
|---|---|---|
| 163 | COFCO Biochemical (AnHui) Co., Ltd.China | Renovation project (fuel ethanol) distillation section integrated EPC project of Design, Equipment material supply, Construction, Commissioning and AcceptanceFuel ethanol · Plant upgrade |
| 211 | China Huaye Group Company LimitedChina | Distillation supply, construction and commissioning for a 300,000 t/y fuel ethanol relocation projectFuel ethanol · Plant upgrade |
| 217 | China Huaye Science & Industry Group Co. Ltd.China | 80,000 t/y dehydration package within a 300,000 t/y fuel ethanol relocation projectFuel ethanol · Anhydrous ethanol · Plant upgrade |
| 225 | CHINA ELVENTH CHEMICAL CONSTRUCTION CO.China | Alcohol Workshop 1 Industrial Ethanol Transformation EPC Project of COFCOPlant upgrade |
Project figures describe the recorded scope and capacity basis. Photos show the identified customer’s project archive and may represent different phases.
01 / CNE
Project scope
Main alcohol distillation unit
02 / CNE
Engineering focus
Start with saleable output, alcohol concentration and annual operating hours. A tonne of product normalized to 95% v/v is a different basis from a tonne of anhydrous product. Cooling-water circulation is also different from fresh-water consumption.
03 / CNE
A plant capacity and a package capacity
Our project scopes distinguish the 300,000 t/y fuel ethanol relocation project from the 80,000 t/y dehydration EPC package within it. It also includes distillation and later industrial-ethanol modification scopes. These references demonstrate different assignments within the COFCO project history; they should not be added together as separate plant outputs.
Explore the engineering behind the project
CNE / Discuss your project
Your next plant starts with the right conversation.
Share your feedstock, target product and capacity. Let’s shape a practical process concept.