Wuming Heli · Stillage concentration
A molasses-alcohol wastewater concentration reference.
CNE project photography
01 /
Project scope
Reference 111 lists a 120 t/day molasses-alcohol wastewater concentration installation for Guangxi Wuming Heli. The project archive contains photographs of the concentration equipment and related site infrastructure. The capacity describes the listed wastewater-treatment duty, not ethanol output.
02 /
Engineering focus
Connect alcohol recovery, concentration and wastewater treatment around the actual stream. Solids, organic load, salts and variability determine whether recovery, evaporation or biological treatment is appropriate. Recovered condensate must be assessed before reuse; concentrate and sludge need defined outlets.
Continue exploring

Stillage, DDGS & co-products
Design the residual streams as part of the plant. Separation, evaporation and drying can be as important to the project as alcohol production.
Explore ↗
Heat integration & plant upgrades
Reduce avoidable heat losses by reviewing the complete energy network before selecting individual equipment.
Explore ↗Your next plant starts with the right conversation.
Share your feedstock, target product and capacity. Let’s shape a practical process concept.
