Revamp an idle distillery for a new feedstock

An existing plant has useful equipment and inherited constraints. A feedstock change starts with a condition survey and a complete mass balance, not a replacement list alone.

CNE v4-indonesia

CNE project photography

01 / CNE

Engineering scope

The Indonesia project moved from a cassava-based production history toward corn-based ENA and medical anhydrous ethanol. That change affects cleaning, milling, mash viscosity, enzyme duty, fermentation and the co-product route. The new fuel distillation/dehydration line was designed for switchable production with the existing line.

We first classify equipment for retention, repair or replacement. Inspection, materials, corrosion allowance, internals and available utility capacity determine what can be reused. Next, the engineering package fixes tie-ins, foundations, piping, controls and shutdown work.

Finally, define commissioning by system and product campaign. Keep host-plant capacity, individual package duty and alternative production modes separate. This makes the investment scope and the acceptance test understandable to both the plant team and the suppliers.

010203040506CNE / PROCESS ENGINEERING

01 / Prepare

Feed preparation, liquefaction & fermentation

The front end sets the conditions for downstream separation. Our cassava front end integrates storage, milling, liquefaction, saccharification and controlled fermentation.

Explore ↗

CNE / Discuss your project

Your next plant starts with the right conversation.

Share your feedstock, target product and capacity. Let’s shape a practical process concept.

Discuss your project ↗